Road Resurfacing Program

2020 Summer/Fall Resurfacing Projects

Several roads are scheduled to be resurfaced in 2019. The following is a preliminary list of roads that will be resurfaced:

Asphalt Paving List

  • Muzzy Drive*
  • Frank Avenue*
  • Plum Street*
  • Spring Street*
  • Aiken Road*

*Due to the onset of COVID-19 the 2020 Shenango Township Asphalt Paving is currently on hold due to the uncertainty in the market and the Governors order to close all non-essential businesses.

Chip Seal List – Repair from 2019 Project

  • Big Run Creek Road
  • Boyd School Road
  • Brentwood Avenue
  • Cascade Boulevard
  • Conner School Road
  • Fletcher Hill Road
  • Greenhouse Road
  • Hollow Road
  • Lower Boyd School Road
  • Old Chewton Road
  • Old Pittsburgh Road
  • Savannah Road
  • Shenango Stop Road
  • Snake Run Road
  • Upper Boyd School Road

Other roads will be addressed in house by the Shenango Township Public Works Department.